Bathroom remodel checklist

Everything to decide, check and ask, from the first idea to the final walk-through. Tick items off as you go; your progress is saved in this browser.

Last reviewed: By Engr. Zakir Ullah Sources How we estimate

How much to budget

Our bathroom remodel cost calculator puts a full, mid-range remodel of a 50 sq ft bathroom with a tiled tub and shower at $13,500 to $16,100 at national average prices, most often around $14,400. Prices vary a lot by state and by the choices you make, so price your own bathroom there.

Keep a cushion for surprises on top: 10 to 20% of the price, about $1,450 to $2,900 on the typical figure, and more in an older home. Track it line by line with our renovation budget template.

0 of 35 done

1 Plan and budget
  • Tub-to-shower conversion cost
  • Bathroom remodel cost calculator
2 Design and choices
3 Hire a contractor
4 Before work starts
5 While the work is going on
  • Change order template
6 Finishing up
  • Punch list template

Your ticks are saved in this browser only; nothing is sent to us. Clearing your browser data removes them.

Bathroom remodel checklist

Plan, budget, choose, hire and finish: 35 steps.

Address: ____________________
Start date: ______________

1. Plan and budget

  • ☐Write down what isn’t working: storage, the shower or tub, lighting, ventilation, or worn-out finishes.
  • ☐Decide whether to keep the toilet, shower and sink where they are. Moving them adds plumbing work.
  • ☐Decide between a tub and a shower. If this is the only tub in the house, think about resale before removing it.
  • ☐Price it for your bathroom and your state, then add a cushion for surprises.
  • ☐If the house was built before 1978, painted surfaces may contain lead: hire a firm that is EPA lead-safe certified.
  • ☐In a condo, check the rules for approvals, working hours and shutting off shared water.

2. Design and choices

  • ☐Measure the room, including the door swing, window, ceiling height and where the drains are.
  • ☐Choose the shower or tub, the shower door or curtain, and the valve and shower head.
  • ☐Choose a vanity that fits the room and the storage you need, and the sink, faucet and mirror.
  • ☐Choose tile for the floor, walls and shower, and ask which waterproofing system goes behind the shower tile.
  • ☐Plan a quiet exhaust fan sized for the room, and ask where it vents to.
  • ☐Plan the lighting, especially at the mirror, and outlets where you need them.
  • ☐Ask for wood blocking in the walls now, so grab bars can be added later without opening the walls.
  • ☐Decide on extras before the walls are closed: a heated floor, niches, a bench or a handheld shower.

3. Hire a contractor

  • ☐Get at least three written quotes for the same scope and the same finishes, so they can be compared line by line.
  • ☐Check each contractor’s license with your state’s licensing board, and ask for proof of liability insurance and workers’ compensation.
  • ☐Ask for references from recent bathroom jobs, and look at photos of finished work.
  • ☐Read the contract before signing: the full scope, model numbers or allowances for anything not yet chosen, start and finish dates, the payment schedule, how changes are handled, and the warranty.
  • ☐Keep the deposit modest and check your state’s rules; some states cap it.
  • ☐Confirm in writing who pulls the permits and books the inspections.

4. Before work starts

  • ☐Plan which bathroom you’ll use, or where else, while this one is out of action.
  • ☐Empty the cabinets and the linen closet nearby.
  • ☐Agree working hours, where the crew parks, which bathroom they use and where the dumpster goes.
  • ☐Agree how the rest of the house is protected: dust barriers, and floor covering on the way in.
  • ☐Order the vanity, fixtures and tile early; special orders can take weeks.

5. While the work is going on

  • ☐Walk the job with the contractor regularly, and keep notes and photos.
  • ☐Ask to see the shower waterproofing, and any leak test, before the tile goes on.
  • ☐Put every change in writing, with its price, and sign it before the work is done.
  • ☐Pay by the schedule as each stage is finished, not ahead of it.
  • ☐Keep receipts, model numbers, paint colors and tile names together for later repairs.

6. Finishing up

  • ☐Do a final walk-through together and list everything that still needs fixing.
  • ☐Run the shower, tub and sink, flush the toilet, and check for leaks again after a few days.
  • ☐Make sure the permit passed its final inspection, and keep the paperwork.
  • ☐Collect warranties and manuals, and register anything that needs registering.
  • ☐Make the final payment once the punch list is done, as the contract says.

Notes

Printable bathroom remodel checklist

All 35 steps in 6 stages, with tick boxes and space for notes. Word and Excel versions can be edited.

Printable bathroom remodel checklist: 35 steps in 6 stages, from planning and budget to the final walk-through, with tick boxes

Common questions

In what order does a bathroom remodel happen?

Usually: demolition; any framing changes; rough plumbing and electrical, with inspections; the tub or shower base; waterproofing; drywall or backer board; tile; vanity, toilet and fixtures; glass door (measured after the tile is done); paint and touch-ups; final inspection and walk-through.

How long does a bathroom remodel take?

A full remodel usually takes two to four weeks on site, longer if plumbing moves or a custom glass door has to be made. Design, quotes and ordering before that can take as long again.

How much should I keep aside for surprises?

Many remodeling guides suggest 10 to 20% of the budget, and more in older homes, where water damage under the floor or behind the shower is common. Use it only for genuine surprises, not for upgrades.

What should I check on the shower before it’s tiled?

That there is a waterproofing layer behind the tile and under the shower floor, that the floor slopes to the drain, and, for a tiled shower floor, that it held water without leaking during a flood test if your contractor does one. It’s much cheaper to fix now than after the tile is on.

Related

Sources and method

Built by Engr. Zakir Ullah, an engineer and Google-certified data analyst. Full method: how we estimate. Last reviewed .